Parts | Standard Repair Times | Coverage Under Extended Warranty |
---|---|---|
U-beam Assembly | 3 hours per Assembly | |
Frame Hanger | 2 Hours per Hanger | |
Clamp Group (top pad and/or bottom cap) | 1.5 Hours per side | |
Air Spring Bracket | 0.5 hour per Bracket | |
D-pin Bushing | 0.25 hour per Bushing | |
QUIK-ALIGN Bushing | 0.25 hour per Bushing | |
Air Spring | One hour per Air Spring | |
Height Control Valve | One - 0.75 hours | |
Shock Absorber | 0.5 hours per Shock | |
Transverse Torque Rod | 1 Rod - 1.5 hours | |
Longitudinal Torque Rod | 1 Rod - 1.0 hour | |
U-bolt | 1 hour per Set |
Need Help? Call 1-855-RIDE-RED or Contact Us